Aller au contenu

Number of consultations since April 21, 2003

autre

En résumé (grâce à un LLM libre auto-hébergé)

  • The document describes a visit to the facilities at Well Y and the oil station. – Technical problems were noted, including a malfunctioning cage and delays in getting it back into service. – Comments were made regarding pollution of Lake Fontvenelle and the need for better communication.

Number of views since April 21, 2003

  • 10 -

Mr. BAUDRY: I would like to receive a copy of the notes taken, right now.

5:30 p.m.: Tour of the facilities: main machine at Well Y and oil station (decanter)

During the tour of the main machine at Well Y, it was noted that:

  • the cage was malfunctioning,
  • the cage hadn’t been moved since Sunday,
  • the estimated time required to get the machine back in operation was 1 hour,
  • the time needed to inspect the cables was approximately 1 hour.

During the tour of the oil station, we noted that if the junior representative and the CHSCT had been informed, they could have made suggestions to prevent pollution of Lake Fontvenelle.

6:30 p.m.: End of the tour.

Attachments:

  • Status of diesel-powered equipment as of February 1, 2003 – 04/21.
  • List of recent tests.

The Secretary,

JL. BAUDRY

The President

JC. LAZAREWICZ

Summaries of Reports

Previous page Back to “Gardanne” page

Number of views since April 21, 2003:

Back to News Back to Guide Back to Home Page